Inspection and Supervision of Works

    Inspection and Supervision of Works
    • Inspection and Supervision of Works of the "Obra Petrolera San Antonio S.A."
    • Inspection and Supervision of Works during the Tank Ship Transformation into PAR 3001 Cargo Container Barge.
    • Inspection and Supervision of Works during the Construction of three 1,000 m3 Cylindrical Vertical Tanks for Vegetable Oil or Animal Fat and a 340 m3 Cylindrical Vertical.
    • Tank for Fire Protection Water for the Cavallaro Industrial Plant.
    • Inspection and Supervision of Works during the transformation of “657” Deck Barge into Cargo Container Barge.
    • Inspection of Works during the construction of oil and bilge tanks in the “Jejuí Towboat.
    • Inspection and Supervision of Works during the construction of Roof Steel Structures for the “Complejo Rakiura” Gym.
    • Inspection of works during the construction of 24 dry cargo barges (12 Rake type and 12 Box type) of 2600 metric ton capacity.
    • Inspection and Supervision of Works during the construction of 4 Tank Barges of 3000 m3 capacity.
2